High River Energy Center, LLC (High River) is seeking authority from the New York State Board on Electric Generation Siting and the Environment (the Siting Board) to construct a 90-megawatt (MW) solar photovoltaic electric generating facility (the Project) in the Town of Florida, Montgomery County, New York, pursuant to Article 10 of the New York State Public Service Law (PSL).

Pursuant to PSL § 163 and Section 1000.5 of the Siting Board’s rules (16 NYCRR § 1000.5), High River submitted twelve paper copies of its Preliminary Scoping Statement (“PSS”) to the Siting Board. An electronic copy of the PSS can also be found at the links below.

High River Energy Center Preliminary Scoping Statement Cover Letter

High River Energy Center Preliminary Scoping Statement

Appendix A. PIP Meeting Log

Appendix B. Copy of Notice

Appendix C. High River Energy Center PIP Plan

Appendix D. Stakeholder List

Appendix E. USFWS IPaC Official Species List

Appendix F. High River Grassland Breeding Bird Survey Work Plan

Figure 1. Regional Project Location

Figure 2. Project Area and Study Area

Figure 3. Preliminary Buildable Area

Figure 4. Mapped Existing Land Use

Figure 5. Existing Vegetated Cover

Figure 6. Agricultural Districts

Figure 7. Flood Zones

Figure 8. Slopes

Figure 9. Mapped Soils

Figure 10. Seismic Hazard

Figure 11. Groundwater Aquifers

Figure 12. Mapped Water Wells

Figure 13. Mapped Streams and Wetlands

Figure 14. Visual Study Area

Figure 15. Tax Assessment Jurisdiction

Response to Comments on the Preliminary Scoping Statement Pursuant to Article 10 of the New York State Public Service Law can be found here.